Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Colombia road tolling contract
    June 20, 2016
    DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo
  • Russia’s US$28 billion road and bridge works
    November 29, 2013
    A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc
  • Major road tunnel project in Malaysia delayed
    January 11, 2016
    The planned Penang project is postponed in Malaysia. This major road tunnel project will be delayed. The project is expected to cost US$1.42 billion and the work will be carried out by the Consortium Zenith BUCG (CZBUCG). For the first phase, three highways with a combined length of 21.2km will be constructed. They are the Air Itam to Tun Dr Lim Chong Eu Expressway bypass, the Gurney Drive to Tun Dr Lim Chong Eu Expressway bypass and the Jalan Tanjung Bungah-Teluk Bahang paired-road. The delay has been attr
  • Colombia's roads to recovery
    February 8, 2012
    Colombia's Ministry of Transport is suggesting that the Avenida Longitudinal de Occidente (ALO) road project in Bogota should be carried out by Colombian energy company Empresa de Energia de Bogota (EEB).