Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Future funding crisis looms?
    August 13, 2012
    From the UK’s Institute for Fiscal Studies (IFS) comes data revealing a future funding crisis many governments will face. The IFS study, commissioned by the RAC Foundation, shows that income from motoring taxation will fall as traffic volumes increase. The problem is that increasing fuel efficiency of new generation vehicles, plus the introduction of electric cars, will deliver smaller and smaller returns on fuel taxation. Although fuel is taxed heavily in the UK, and right across Europe, projections show t
  • New Russian road works being planned
    November 1, 2021
    New Russian road works are being planned in Crimea and St Petersburg.
  • Conference highlights Mexico's highway investment
    February 27, 2012
    At the recent PIARC World Road Conference in Mexico City the country’s president, Felipe Calderon, made a keynote opening address. Calderon emphasised that infrastructure investment and expansion forms a crucial component in the country’s future economy and as such, has been a priority for his administration. Calderon took office in 2006 and by the end of this year Mexico will have built or rebuilt some 19,000km of roads and highways in the country. Due to its proximity to the US, Mexico is highly dependen
  • UK is pothole failure among OECD nations
    August 30, 2023
    The Local Government Association says information shows that nearly US$5.1 billion was spent in 2006 on UK local road maintenance compared with $2.54 billion in 2019.