Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Austrian highway investment programme planned
    February 17, 2015
    A major programme of investment is underway on Austria’s highway network. Austrian highway company Asfinag says that it is investing some €7 billion in building new links and upgrading existing connections. This six year programme will run until 2020. The programme calls for work to both highways and major trunk routes. One of the key projects underway already is the upgrade of the A26, which is costing €646 million. Another important project is the upgrade of the S10 trunk road, which is costing €718 milli
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • China’s infrastructure development for Anhui and Jiangsu Provinces
    July 21, 2017
    China’s Anhui and Jiangsu Provinces are developing transport infrastructure with a series of major projects. In Anhui Province plans have been drawn up for road and highway improvements as well as upgrades to other categories of transport infrastructure over the period from 2017 to 2021. The road expansion programme will see Anhui Province increase its highway network by 1,157km to 5,700km during this period.
  • Progress for new highway project in Colombia
    June 5, 2014
    In Colombia the firm Estructura Plural Mario Alberto Huertas-Constructora MECO has been awarded the Girardot-Puerto Salgar 4G highway concession. The US$674 million concession was awarded following a short delay due to legal complexities by Colombia's national infrastructure agency ANI, reports Business News Americas. The 214km Girardot-Puerto Salgar highway is in central Colombia and the concession package includes the construction of 190km of the route, of which 22km will be totally new. A 135km stretch w