Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Colombia’s La Linea Tunnel link opening
    September 1, 2020
    Colombia’s La Linea Tunnel link is opening to traffic.
  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • Colombia’s massive roads programme is seeing delays
    March 19, 2024
    Colombia’s massive road expansion programme is seeing delays.
  • Colombia appoints EDL for feasibility of Conexion Pacifico-Orinoquia
    February 19, 2016
    Colombia's National Road Institute (Invias) has reported that engineering firm Enrique Davila Lozano (EDL) is carrying out the second phase of feasibility studies and designs for construction of the Conexion Pacifico-Orinoquia road. The highway will link the Valle del Cauca department with the Orinoquia region. Consortium Consorcio SMA-TEC 4 is compiling the inventory during the second phase. Conexion Pacifico-Orinoquia will pass through Meta, Vichada, Guaviare, Casanare, Tolima, and Huila. The