Skip to main content

Colombia bridge connection completion

A key bridge connection project has now been completed in Colombia. The work forms part of the construction activity on the Magangue to La Bodega route. The new link connects the 1km long Santa Lucia Bridge with the 2.3km long Roncador Bridge, the latter being the longest bridge in Colombia and the fifth longest in Latin America.
December 15, 2017 Read time: 1 min

A key bridge connection project has now been completed in Colombia. The work forms part of the construction activity on the Magangue to La Bodega route. The new link connects the 1km long Santa Lucia Bridge with the 2.3km long Roncador Bridge, the latter being the longest bridge in Colombia and the fifth longest in Latin America. The 12km Magangue to La Bodega road project is costing US$81.3 million and will provide a link between two of Colombia’s key routes, Troncal de Occidente and Ruta del Sol. Construction activity on the entire Magangue to La Bodega route should be complete during 2019, once the surfacing work has been finished.

Related Content

  • Colombia’s popular highway tenders
    April 7, 2014
    International interest is strong in tenders opening in Colombia for the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad, worth some US$4.75 billion in all. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.
  • Colombian bridge now complete
    September 29, 2020
    A key Colombian bridge replacement is now complete.
  • Challenging Colombian tunnel completed
    May 30, 2024
    A tunnel stretch on Colombia’s Santa Fe - Cañasgordas highway is complete – Mauro Nogarin reports
  • Colombia establishing infrastructure action plan
    October 22, 2018
    Colombia is establishing an action plan for its infrastructure programme, focussing on sourcing suitable financing. The country’s national road institute, Invias, is looking for US$659.5 million to carry out a series of 26 road resurfacing projects. Work on these commenced as far back as 2004 but numerous stretches remain incomplete and it will take until 2022 for the surfacing operations to be concluded. Meanwhile another new division will oversee the La Linea Tunnel and Ruta Del Sol II projects. The form