Skip to main content

Collapsed Italian bridge to be replaced

Plans are being drawn up for a new structure to replace the Morandi Bridge in Italy, which collapsed recently with disastrous results. The Italian road firm Autostrade per l'Italia (ASPI) has a draft design that features eight supports, unlike the failed Morandi Bridge, which was designed with 11 supports. The new bridge design also includes a deck that features emergency lanes, which were not included on the old Morandi Bridge.
September 5, 2018 Read time: 1 min
Plans are being drawn up for a new structure to replace the Morandi Bridge in Italy, which collapsed recently with disastrous results. The Italian road firm 3623 Autostrade per l'Italia (ASPI) has a draft design that features eight supports, unlike the failed Morandi Bridge, which was designed with 11 supports. The new bridge design also includes a deck that features emergency lanes, which were not included on the old Morandi Bridge.


Meanwhile a plan has also been drawn up for the removal of the failed Morandi Bridge structure. Different demolition techniques will be utilised to remove the damaged structure, including the use of hydraulic cutting equipment and breakers mounted on long reach excavators for controlled demolition, as well as tightly-controlled blasting. One section of the failed bridge stands above housing and presents particular challenges to its safe removal. Should the demolition work go to plan, the structure should be removed by October 2018.

For more information on companies in this article

Related Content

  • Genoa’s San Giorgio Bridge set to open
    July 31, 2020
    Contractor Webuild has been completing work, including solar panel installation.
  • Advances in tunneling machines coming to market
    November 19, 2015
    A diverse array of new tunnelling technologies will help boost productivity and cut project costs, while boosting quality - Mike Woof writes The worldwide market for tunnelling projects continues to be strong, with a series of major projects underway or planned for the future. These good market conditions have helped fuel research and development in new tunnelling equipment, designed to be more productive, more efficient and more reliable and able to deliver a higher quality of work. Drilling and blas
  • New Holland machines help rebuild busy Italian airport
    August 18, 2014
    Italy’s Il Caravaggio International Airport handles close to 9 million passengers/year, making it the country’s fourth busiest. Originally called Bergamo Orio al Serio Airport, it is a popular facility for low cost airlines as it is close to Bergamo and just 40km from Milan, as well as being convenient for other destinations in Northern Italy.
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of