Skip to main content

Colas and He-Do win Jaszbereny bypass

The 4.5-km bypass will be built between Hungary’s number 31 and 32 main roads.
By David Arminas April 27, 2020 Read time: 1 min
Jaszbereny, in Hungary, to get a bypass road (photo © Butenkow/Dreamstime)

Colas, through its Hungarian subsidiary, and HE-DO have won a tender for construction of a bypass road around Jaszbereny, about 60km from Budapest.

The 4.5-km long road section is to be built between the number 31 and 32 main roads and will include a 66m bridge over the river Zagyva.

The tender was called by the Hungarian national infrastructure development company NIF and is worth around €15.2 million (US$17.5 million), according to national media.

For more information on companies in this article

Related Content

  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.
  • Mota-Engil wins Cardel-Poza Rica motorway contract in Mexico
    June 13, 2014
    Mexico's Secretarat of Communications of Transport (SCT) has awarded the contract to build the Cardel-Poza Rica motorway to Portuguese company Mota-Engil. The proposal made by the company, together with PRODI, of US$266.48 million (MXN 3.47 billion), was deemed the most feasible technically and financially. The offer was below the $307.53 million (MXN 4 billion) estimated for the project in the National Infrastructure Plan (PNI). The road will be located in Veracruz, spanning 129km between Laguna Verde and
  • Paraguay to invest US$500mn in roads during 2014
    January 21, 2014
    Paraguay’s Ministry of Public Works and Communications (MOPC) is this year said to be planning to invest US$500 million in the South American country’s roads. The figure is said to be part of a proposed infrastructure investment of $7.66 billion for the period 2013-2016. Among the 2014 road projects will be the estimated $84.46 million repair of Route 8 -72.9kms – put out to tender by the MOPC in December 2013. All bids must be submitted on 29 January 2014. Route number 9 -Transchaco- between Mariscal Est
  • Metrostav and Bertelsen & Garpestad in E8 deal
    June 9, 2023
    The Norwegian project includes 10km of new road and an 870m-long bridge across the Ram Fjord, part of the European route E8 between Norway and Finland.