Skip to main content

Chinese contractor demolishes bridge and housing block

A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.
June 13, 2014 Read time: 1 min
A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.

Related Content

  • Belgium road crashes increase around road works
    May 16, 2018
    There has been an increase in the number of road crashes in Belgium around work zone sites. This problem has been identified by Belgium’s traffic safety institute, VIAS. In 2014 there were 588 road crashes around road work zones in Belgium. However the data shows that in 2016, there were 764 crashes around work zone areas. An increase in the number of road repair jobs is thought to be a factor in this jump in crashes in work zones. Of note is that comparatively few of the crashes occur on major highway rout
  • Ulma uses its CVS Cantilever Formwork Carriage over the Odra
    February 11, 2020
    A second Odra River bridge in Cigacice is the last stage of work for a section of the S3 expressway in Poland’s Lubuskie township. The bridge is part of the S3 route between Sulechów to Nowa Sól and is expected to be completed by year’s end.
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Parking problem
    February 27, 2012
    An Australian couple caused something of a parking problem with their vehicle in a quiet residential Sydney side-street. The issue was that their vehicle should have been in the air rather than on the ground, as it was a single engine Piper aircraft.