Skip to main content

China to begin works on Serbia’s Corridor 11 motorway later this month

Chinese company Shandong High Speed Group is planning to begin construction works on Serbia’s Corridor 11 motorway in the second half of September 2013. Shandong will participate with 51% of works on the Lajkovac-Ljig and Obrenovac-Ub parts of the motorway, with domestic companies participating in the remainder of the works, due for completion within 38 months. Meanwhile, the Azerbaijan-based firm Azvirt is working on the 40km part of the Ljig-Preljina motorway, worth a total of €308 million.
August 27, 2013 Read time: 1 min
Chinese company Shandong High Speed Group is planning to begin construction works on Serbia’s Corridor 11 motorway in the second half of September 2013.

Shandong will participate with 51% of works on the Lajkovac-Ljig and Obrenovac-Ub parts of the motorway, with domestic companies participating in the remainder of the works, due for completion within 38 months.

Meanwhile, the Azerbaijan-based firm 5414 Azvirt is working on the 40km part of the Ljig-Preljina motorway, worth a total of €308 million.

For more information on companies in this article

Related Content

  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • New road and bridge project for Serbia
    May 7, 2020
    New road and bridge projects are being planned for Serbia.
  • Serbia’s Nis-Pristina motorway inches ahead
    October 24, 2016
    Serbia will cooperate with Albania on construction of the proposed Nis-Merdare-Prishtina motorway, according to media reports. Serbian vice president and Minister of Construction, Transport and Infrastructure, Zorana Mihajlovic, said that the motorway will be part of a larger project to give faster access, through Pristina, capital of Kosovo, to Albania’s Adriatic Sea port of Drac.
  • Serbia’s highway construction programme is on track
    December 4, 2014
    Serbia is on schedule with its construction programme for highways and roads. The country looks set to have completed 64km of highways and 15km of parallel or link roads during 2014. This figure compares favourably with the average 50km/year construction rate across most European countries currently building highways. Meanwhile Serbian road company Koridori Srbije looks set to merge with the road company Putevi Srbije. Koridori Srbije has already built 51km of highways during 2014. The remainder should be c