Skip to main content

Chile road project, tender process opening

The tender process is opening for an important road project for Chile. The bidding process for the 142km road upgrade project is opening at the end of May 2019, with construction expected to start in 2021 once the necessary permissions process and financing package has been finalised. The work is for the improvement of the Camino de la Fruta road link, Chile’s Ruta 66. This road runs from San Antonio on the coast and connects with the country’s key north-south link, Ruta 5, at Pelequén to the north of San F
April 17, 2019 Read time: 2 mins
The tender process is opening for an important road project for Chile. The bidding process for the 142km road upgrade project is opening at the end of May 2019, with construction expected to start in 2021 once the necessary permissions process and financing package has been finalised. The work is for the improvement of the Camino de la Fruta road link, Chile’s Ruta 66. This road runs from San Antonio on the coast and connects with the country’s key north-south link, Ruta 5, at Pelequén to the north of San Fernando.


In addition, the tender process is expected to reopen for upgrade and expansion project for the Ruta 78 Autopista del Sol route in 2020. The Ruta 78 road link connects the capital, Santiago, with San Antonio.

Both tender processes are being handled by Chile’s Ministry of Public Works (MOP).

Related Content

  • Chile announces road projects, including for the Autopista del Sol
    October 23, 2015
    The Chilean government has announced around 800 road projects for 2016, mostly linked to road concessions, costing about US$1.44 billion. Schemes include those on the Autopista del Sol motorway, such as a third lane between Santiago and Talagante, an alternative access to Penaflor, improvements to the Talagante link and a control centre. In addition, a $5.2 million stop-and-go tag-type toll payment system will be introduced for Autopista del Sol, which will be similar to ones on Ruta 5 Sur between Angost
  • Colombia's roads to recovery
    February 8, 2012
    Colombia's Ministry of Transport is suggesting that the Avenida Longitudinal de Occidente (ALO) road project in Bogota should be carried out by Colombian energy company Empresa de Energia de Bogota (EEB).
  • Colombian concession contracts cause concern
    June 13, 2014
    A report from insurance firm AIG warns that up to half of Colombia's 4G highway concessions could face financial hurdles due to over-estimated predictions of traffic flows. Colombia is at present putting out to tender its fourth generation (4G) concessions, which involve some US$25 billion in investment, reports Business News America. This investment is impressive and is Latin America's biggest move to expand and improve road infrastructure. But while many companies have shown interest and were prequalified
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C