Skip to main content

Chile highways subject to negotiation

Key highway links in Chile are likely to see upgrading, although the operation of the links could change. The country’s Ministry of Public Works (MOP) is keen to see widening work for Ruta 68, a route currently operated by Abertis. However MOP has not revealed if it intends to buy back the Ruta 68 contract from the operator and then put the highway back out to tender, with the new deal then including the widening work. It may prove simpler to strike a new deal with Abertis that includes the necessary highwa
July 13, 2016 Read time: 1 min
Key highway links in Chile are likely to see upgrading, although the operation of the links could change. The country’s Ministry of Public Works (MOP) is keen to see widening work for Ruta 68, a route currently operated by 5729 Abertis. However MOP has not revealed if it intends to buy back the Ruta 68 contract from the operator and then put the highway back out to tender, with the new deal then including the widening work. It may prove simpler to strike a new deal with Abertis that includes the necessary highway upgrade.

Meanwhile interest is strong in Chile’s Americo Vespucio Oriente 2 motorway project (AVO). Abertis and another Spanish firm, Sacyr, are showing interest in this highway and have discussed running it under a partnership arrangement.

For more information on companies in this article

Related Content

  • Chile awards CRCC major Talca-Chillán upgrade
    April 14, 2021
    China Railway Construction Corporation will upgrade and operate a section of Route 5.
  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Successful talks for Chile-Argentina tunnel
    August 28, 2014
    Successful talks have been held between Chile and Argentina with regard to the Agua Negra Tunnel that will link the two countries. The project looks set to cost US$1.37 billion to construct, according to Business News Americas. The majority of the planned route, 72%, lies in Argentina and the country will provide the bulk of the funding required; some $986 million. Chile will provide the remaining $384 million. The agreement was struck between the Publics Works Ministries of the two countries. Further detai
  • XCMG boosting capacity
    January 6, 2017
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility