Skip to main content

Chile highways subject to negotiation

Key highway links in Chile are likely to see upgrading, although the operation of the links could change. The country’s Ministry of Public Works (MOP) is keen to see widening work for Ruta 68, a route currently operated by Abertis. However MOP has not revealed if it intends to buy back the Ruta 68 contract from the operator and then put the highway back out to tender, with the new deal then including the widening work. It may prove simpler to strike a new deal with Abertis that includes the necessary highwa
July 13, 2016 Read time: 1 min
Key highway links in Chile are likely to see upgrading, although the operation of the links could change. The country’s Ministry of Public Works (MOP) is keen to see widening work for Ruta 68, a route currently operated by 5729 Abertis. However MOP has not revealed if it intends to buy back the Ruta 68 contract from the operator and then put the highway back out to tender, with the new deal then including the widening work. It may prove simpler to strike a new deal with Abertis that includes the necessary highway upgrade.

Meanwhile interest is strong in Chile’s Americo Vespucio Oriente 2 motorway project (AVO). Abertis and another Spanish firm, Sacyr, are showing interest in this highway and have discussed running it under a partnership arrangement.

For more information on companies in this article

Related Content

  • XCMG boosting capacity
    November 26, 2012
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • Uruguay’s project tender attracts interest
    March 14, 2018
    Interest has been strong in the tender process for Uruguay’s Road Corridor Number 5 project.
  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l
  • New South Wales is seeking financial packers for WestConnex in Sydney
    June 19, 2015
    Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as