Skip to main content

Chile highway link faces future issues

Chile’s busy Route 68 between capital Santiago and the country’s main port of Valparaiso faces an uncertain future. The 110km highway carries heavy traffic volumes and is close to its capacity of 4,500 vehicles/hour at peak periods, with extensive works required to improve the route. The work to upgrade Route 68 is expected to cost up to US$170 million, with eight sections of the highway in particular need of attention. The tender process for the upgrade work will open shortly. The Chilean Government opt
January 24, 2017 Read time: 2 mins
Chile’s busy Route 68 between capital Santiago and the country’s main port of Valparaiso faces an uncertain future. The 110km highway carries heavy traffic volumes and is close to its capacity of 4,500 vehicles/hour at peak periods, with extensive works required to improve the route. The work to upgrade Route 68 is expected to cost up to US$170 million, with eight sections of the highway in particular need of attention. The tender process for the upgrade work will open shortly.

The Chilean Government opted not to buy back the concession for Route 68 from Abertis, which operates the route at present. It was decided that this option would have been too costly. Instead, the Chilean Government decided to maintain the current agreement with Abertis until 2023, with the requirement that the concessionaire would carry out the very necessary capacity and safety upgrades.

However there are plans also to construct an additional highway link joining Santiago with Valparaiso, which would lie to the north of the existing Route 68. This project could cost as much as $1 billion to construct as it would require building a section through Chile’s Cordillera de la Costa coastal mountain range and would include a tunnel stretch. The new route would reduce journey times between Santiago and Valparaiso and improve transport connections to the commuter towns of Quilpue, Villa Alemana and Limache.

Related Content

  • New bridge and road projects underway for Chile
    December 18, 2013
    Strong bids have been received for Chile’s Puente Industrial road bridge project, which will be built in Region VIII. Bidders included Spanish firm OHL as well as Besalco Concesiones-Concesiones Viarias Chile Tres and Sacyr Concesiones Chile. Work on the 2.5km bridge is expected to commence in 2014 and the project will cost some US$170 million to construct, with completion expected in 2017. The deal for the four lane bridge includes building access roads and involves a 30 year concession package. The Puente
  • Paso de las Leña tunnel between Argentina and Chile
    December 22, 2016
    A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.
  • New route for Chilean capital
    July 8, 2013
    Chile’s congested capital Santiago is set to benefit from the construction of a key route that will help reduce journey times and improve traffic flow, particularly at peak periods. The tender process will open shortly for the Americo Vespucio Oriente (AVO) highway in Santiago, a 9.3km highway connection that will include the construction of a tunnel under the San Cristobal area.
  • New highway tender for Chile’s capital
    July 26, 2013
    The tender process is commencing for the Américo Vespucio Oriente expressway (AVO) in Chilean capital Santiago. The US$940 million tender is due to be awarded in February 2014. The 9km highway link will connect El Salto with Príncipe de Gales Avenue and will feature three lanes running in either direction, with a design speed of 80-100km/h. An underground section of this urban highway looks likely to be constructed using the New Austrian Tunnelling Method (NATM) while it may also include a section in an ope