Skip to main content

Canada's border link

The tender process for the vital Windsor-Essex Parkway 11km that links highway 401 in Ontario (Canada) with the US border through Michigan State is underway.
February 28, 2012 Read time: 1 min
RSSThe tender process for the vital Windsor-Essex Parkway 11km that links highway 401 in Ontario (Canada) with the US border through Michigan State is underway. The US$1.6 billion project is for a 30 year build and operate contract and is attracting key bidders. Firms bidding include 917 ACS and 976 Acciona, 2378 Macquarie and 981 Hochtief, and 5792 HSBC Infrastructure, Bilfinger and 1378 John Laing. The work is due to start in 2011 and includes a bridge and a connection link to the US interstate system.

For more information on companies in this article

Related Content

  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • Construction of Slovakia’s D3 stretch to start by end of 2016
    November 28, 2016
    Construction of the 5.6km stretch of the D3 motorway Cadca, Bukov - Svrcinovec in Slovakia could start by the end of the year. The tender was rolled out in May 2015 by the Slovak national motorway operator NDS and the final contract was recently signed for the €239million deal. Winners are the consortium of Hochtief from Germany and Austrian firms Strabag and PORR. Completion is schedule for 2020. Porr’s share of the contract is reportedly around €81 million and Strabag's around €105 million. Work inc
  • Slovakia highway opening faces delays
    March 2, 2017
    A key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hr
  • Systra, Kiewit and Hatch to build third bridge in Kingston, Canada
    August 31, 2018
    Kingston, Canada, has selected Systra International Bridge Technologies, Peter Kiewit Sons and Hatch as the preferred consortium for the design and build Third Crossing project. Seven international teams answered the requests for proposals in February and 2018 with Systra, Kiewit and Hatch eventually chosen from a shortlist of three groups. The consortium will use an integrated project delivery model for the two-lane 1.2km bridge with a pedestrian and cycle path over the Cataraqui River will connect