Skip to main content

California connection construction contract

In California construction is commencing on a connection called Cow Camp Road. Engineering work is being carried out on the project by Michael Baker International. The firm is handling Phase 2 of a contract by Rancho Mission Viejo LLC (RMV). The road will be located in south Orange County, California. Cow Camp Road. This 6.4km stretch of highway will improve connections between Antonio Parkway and Ortega Highway (SR-74). The planned improvements will be carried out in Phases 2A, 2B, 2C and 2D. The work bein
March 23, 2017 Read time: 2 mins
In California construction is commencing on a connection called Cow Camp Road. Engineering work is being carried out on the project by Michael Baker International. The firm is handling Phase 2 of a contract by Rancho Mission Viejo LLC (RMV). The road will be located in south Orange County, California. Cow Camp Road. This 6.4km stretch of highway will improve connections between Antonio Parkway and Ortega Highway (SR-74). The planned improvements will be carried out in Phases 2A, 2B, 2C and 2D. The work being handled includes design and construction of a 427m-long bridge over the Gobernadora Canyon and drainage improvements. It also includes design of the final portion of the Cow Camp roadway, with a 213m-long bridge over San Juan Creek and a connection to the busy SR-74 route.

This project is a continuation of work carried out in Phase 1. In 2012, Michael Baker handled engineering services for Phase 1 of the project including four intersections and a 427m-long, bridge structure spanning Chiquita Canyon. And in 2016, Michael Baker completed the Project Study Report (PSR) for Phase 2 of the project.

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.
  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re
  • Parsons Brinckerhoff is working on a key project in North Carolina
    May 7, 2013
    Parsons Brinckerhoff is now working with Blythe Construction on a US$69 million project for the Salem Creek Connector in Winston-Salem. The deal was awarded by the North Carolina Department of Transportation (NCDOT) and the two companies are handling the design and construction for a 1.7km section of four-lane highway on US52, which includes concrete pavement widening work. The project includes a new diverging diamond interchange and eight new bridges, including two railroad bridges. The new roadway is red
  • Designer for Texas highway expansion
    September 27, 2023
    The designer has been selected for a Texas highway expansion.