Skip to main content

California connection construction contract

In California construction is commencing on a connection called Cow Camp Road. Engineering work is being carried out on the project by Michael Baker International. The firm is handling Phase 2 of a contract by Rancho Mission Viejo LLC (RMV). The road will be located in south Orange County, California. Cow Camp Road. This 6.4km stretch of highway will improve connections between Antonio Parkway and Ortega Highway (SR-74). The planned improvements will be carried out in Phases 2A, 2B, 2C and 2D. The work bein
March 23, 2017 Read time: 2 mins
In California construction is commencing on a connection called Cow Camp Road. Engineering work is being carried out on the project by Michael Baker International. The firm is handling Phase 2 of a contract by Rancho Mission Viejo LLC (RMV). The road will be located in south Orange County, California. Cow Camp Road. This 6.4km stretch of highway will improve connections between Antonio Parkway and Ortega Highway (SR-74). The planned improvements will be carried out in Phases 2A, 2B, 2C and 2D. The work being handled includes design and construction of a 427m-long bridge over the Gobernadora Canyon and drainage improvements. It also includes design of the final portion of the Cow Camp roadway, with a 213m-long bridge over San Juan Creek and a connection to the busy SR-74 route.

This project is a continuation of work carried out in Phase 1. In 2012, Michael Baker handled engineering services for Phase 1 of the project including four intersections and a 427m-long, bridge structure spanning Chiquita Canyon. And in 2016, Michael Baker completed the Project Study Report (PSR) for Phase 2 of the project.

Related Content

  • US$250 million Colorado construction contract commences
    June 26, 2024
    A US$250 million Colorado highway construction contract is now underway.
  • Texas Interstate connection upgrade project
    January 31, 2018
    Consultancy firm Michael Baker International has a US$4 million contract from the Texas Department of Transportation (TxDOT) to provide safer road links and bridges along the southern gateway corridor into Dallas. This project is due for completion in 2021. It will provide a long-term transportation and operational improvement effort to boost safety, cut congestion and while address roadway deficiencies and system linkage for the critical I-35E and US 67 artery.
  • Texas highway contract
    January 22, 2018
    Michael Baker International has been awarded a US$6.1 million contract by the Texas Department of Transportation (TxDOT). The contract is for Construction Engineering and Inspection (CEI) services for the Lowest Stemmons Freeway project. The Lowest Stemmons project, a 3.7km stretch of Interstate-35E (I-35E), runs from Interstate-30 to north of Oak Lawn Avenue in Dallas. The aim of the project is to reduce congestion, improve mobility and deliver more reliable travel times. The project is also the first for
  • New funding for 44 infrastructure projects
    December 26, 2024
    New funding awards escalate the launch of 44 major infrastructure projects.