Skip to main content

Brunei bridge being built

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.
August 4, 2017 Read time: 1 min

Work is progressing on the major Temburong Bridge project in Brunei. This bridge will measure nearly 12km in length, with the work being handled by a series of contractors. Both the Chinese contractor China State Construction Engineering Corporation Limited (CSCEC) and the South Korean firm Daelim Industrial are involved in the project. Work being carried out also includes the construction of two viaducts measuring 13.4km. The link is expected to open to traffic in 2019.

Related Content

  • Key link on track in US
    April 25, 2012
    Work on the DFW Connector project in Texas is now 50% complete. When it is finished, the DFW Connector project will reduce congestion for drivers in the Dallas-Fort Worth area. The DFW Connector is the largest investment of American Recovery and Reinvestment Act funding, US$260 million, in a highway project.
  • Tanzania road development projects being planned
    March 24, 2017
    A series of major road projects are now being planned in Tanzania, with funding sources for much of the work having been identified and secured. The largest of these is being delivered with a World Bank loan worth US$425 million, which will help pay for transport improvements in Tanzania’s capital, Dar es Salaam.
  • Zimbabwe key road link rebuild
    March 29, 2019
    Construction activity now looks set to recommence on Zimbabwe’s important Harare to Bulawayo road upgrade project.
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C