Skip to main content

Bridge proposal for Denmark

Proposals have been put forward for a new bridge in Denmark to connect the islands of Als and Funen.
March 5, 2012 Read time: 1 min
Proposals have been put forward for a new bridge in Denmark to connect the islands of Als and Funen. The bridge has an estimated cost of some €2.68 billion and its construction has been suggested by 1434 Danfoss, the specialist manufacturer of hydraulic systems which is a major industry in Denmark. Should the bridge go ahead it would be financed partly by being a tolled link under the proposed scheme. Backers for the plan have yet to be found however and the plans remain at an early stage.

For more information on companies in this article

Related Content

  • Canada’s key temporary bridge ahead of time and lower cost
    October 2, 2014
    In Canada, a seven-lane temporary causeway bridge between downtown Montreal and Nuns' Island, initially scheduled to open by early 2015, has finished ahead of deadline and under budget. Initially, the cost of the key transport structure was estimated at US$111.89 million (CAD 125 million). The temporary bridge is being used by Montreal-bound vehicles initially, with the first users crossing on Monday (6 October 2014). A complete closure of the Champlain Bridge's all Montreal-bound lanes for two days was
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Value of UK construction projects up 67.1% in past year
    January 24, 2014
    The value of construction projects in the UK has shot up by 67.1% in the last year, according to a new report. New project contracts awarded in December 2013 totalled €7.31 billion (£6 billion), compared to €4.38 billion (£3.6 billion) in the same month in 2012. The infrastructure sector proved to be an area of significant growth last month, with the total value of projects awarded reaching €2.68 billion (£2.2 billion), a 10.6% increase from November 2013 and a huge 101.6% year-on-year growth.
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C