Skip to main content

Bridge monitoring plan

The Nepalese Government is setting out plans for the quality and standards of construction and maintenance of roads and bridges.
February 27, 2012 Read time: 1 min
The Nepalese Government is setting out plans for the quality and standards of construction and maintenance of roads and bridges. The plans include technical tests, monitoring and evaluation and the aim of this is to tackle early failures of infrastructure in the country. Bridges in particular have been suffering from structural issues and the aim is to eliminate such problems by monitoring condition more effectively. If bridges or other infrastructure is found to be defective early in its design life, arrangements will be made to claim compensation from the contractor.

Related Content

  • New tests for modified bitumens and mixes with RAP
    December 19, 2014
    This month we learn about a new test which is helping to predict the performance of asphalt mixtures containing recycled materials and modifiers, and we showcase some of the new testing equipment recently launched - writes Kristina Smith Researchers in the US have come up with a new test to help owners and contractors better predict the performance of their roads. “The problem is that the current tests cannot determine the performance of new materials,” said Dr Haleh Azari, manager of the AASHTO Advanced P
  • Bridge monitoring technology
    July 1, 2019
    A new partnership between SGS and AIMSight is allowing fully remote continuous structural health monitoring (SHM) of bridges. This utilises using smart crack monitoring sensors and data analytics and is compliant with existing NDT standards. The new SGS AIMSight structural health monitoring solution provides continuous, real time monitoring of the health of critical assets to a higher level of precision than conventional SHM systems and structural inspection schemes. This serves as an early warning system
  • UK developing plan to tackle driving under the influence of drugs
    March 22, 2012
    The UK Government is now working on a plan to address the road safety issues caused by driving under the influence of drugs. A panel of experts has been set up to evaluate the levels of various illegal drugs in the bloodstream that would affect driving ability.
  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track