Skip to main content

Breakthrough on Slovakia’s D1 tunnel near Zilina

Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
December 12, 2016 Read time: 2 mins
Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project.

Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper.

Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders.

Juraj Valent, head of the National Highway Company (NDS), said the section with its two tunnels and 11 bridges is scheduled for completion by October 2018. Cost is around €427 million, with money coming from the central government and the European Union.

Slovakia’s D1 motorway runs from the western border with the Czech Republic to the eastern border with the Ukraine, a 100km frontier amid remote forested areas. The government has been building and renovating the route since 1985 when a cross-country route was planned in earnest. The D1 also forms part of the European routes E50, E58, E75 E571.

Related Content

  • Mott MacDonald to design highway improvements in Czech Republic
    August 6, 2015
    Mott MacDonald has been appointed by the Road and Motorway Directorate of the Czech Republic to design sections of the R35 and R55 expressways. R35 connects the Bohemia and Moravia regions and runs parallel to the D1 motorway, the longest in the country. Mott MacDonald will design a 5.8km section of the expressway, including three bridges, two interchanges, two roundabouts, four overpasses and one railway viaduct. One watercourse will also be relocated as part of the scheme.
  • Chinese firms to work on Serbia’s Corridor 11 project
    November 30, 2015
    Serbia and China have signed a memorandum of understanding for construction of two sections of Serbia’s Corridor 11. The MoU was inked in during Serbian Prime Minister Aleksandar Vucic’s visit to the Chinese capital Beijing last week. Serbia’s Tanjug news agency reported that Vucic said the deal was worth around €209 million and included construction of the 18km Surcin-Obrenovac bridge. Corridor 11 runs from the Serbian capital Belgrade southwest to the border with Montenegro, another member state of
  • Budimex wins a 20km section of S61 from Wysokie junction to Raczki
    February 16, 2018
    Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C