Skip to main content

Breakthrough on Slovakia’s D1 tunnel near Zilina

Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
December 12, 2016 Read time: 2 mins
Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project.

Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper.

Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders.

Juraj Valent, head of the National Highway Company (NDS), said the section with its two tunnels and 11 bridges is scheduled for completion by October 2018. Cost is around €427 million, with money coming from the central government and the European Union.

Slovakia’s D1 motorway runs from the western border with the Czech Republic to the eastern border with the Ukraine, a 100km frontier amid remote forested areas. The government has been building and renovating the route since 1985 when a cross-country route was planned in earnest. The D1 also forms part of the European routes E50, E58, E75 E571.

Related Content

  • Skanska to Slovakia’s D1 motorway for €214 million
    September 6, 2016
    Skanska has won a contract with the National Highway Authority (NDS) to extend the 14.4km long motorway D1 in eastern Slovakia. The new motorway will include 23 bridges and four viaducts, along with required noise protection. Another R2/R4 express road will also be extended.
  • Poland awards three Expressway S19 sections
    March 11, 2017
    The Polish General Directorate for National Roads and Motorways – GDDKiA –reports that 14 bids have been received for construction of three sections of the S19 dual carriageway. A consortium formed by Pizzarotti and Fundamental Infrastructure pitched the lowest bid for the Krasnik Poludnie - Janow Lubelski Polnoc section, amounting to nearly €80 million. The lowest offer for the construction of the second section – a ring-road around the town of Janow Lubelski – was just over €34 million and made by M
  • Slovakian road tunnel plan
    January 18, 2023
    Slovakia’s new road tunnel is being planned.
  • Slovakia’s new highway tenders opening
    November 15, 2024
    Slovakia is opening new highway tenders to bidders.