Skip to main content

Bordeaux gets sixth bridge, Simone Veil Bridge, formerly JJ Bosc

The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River. The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge. The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.
July 11, 2017 Read time: 2 mins
The proposed Simone Veil Bridge in Bordeaux (photo courtesy of OMA REM Koolhaas-Clement Blanchet Architects)

The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River.
 
The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge.

The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.

The consortium led by civil contractor Razel-Bec includes 217 Fayat TP for the earthworks, drainage works and roads and utilities, Sefi intrafor for the special foundations, ETPO for in-river works, Baudin Chateauneuf together with Barbot for roof-framing works.
 
The bridge, as designed by Rem Koolhaas and Clément Blanchet of OMA architecture firm, will accommodate various forms of urban mobility and “constitutes both a link and a living space”.
 
A video focusing on design of the bridge is available on the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Facebook page of OMA Facebook page of OMA Link false http://www.facebook.com/pg/razelbecfayat/videos/?ref=page_internal false false%>.

Until Veil’s death in June, the bridge was to be called the Jean-Jacques Bosc Bridge after the prominent 19th century Bordeaux businessman and politician.

Simone Veil was a French lawyer and politician who served as minister of health under French president Valéry Giscard d'Estaing from 1993 to 1995. She was also president of the European Parliament and a member of the Constitutional Council of France.

Bordeaux has five road bridges across the Garonne. The oldest is the Pont de pierre, built in the 1820s and three modern bridges built after 1960: the Pont Saint Jean, the suspension Pont d'Aquitaine and the Pont François Mitterrand. Aquitaine and Mitterand bridges are part of the Bordeaux the ring road.

The fifth bridge, the Pont Jacques-Chaban-Delmas, was finished was opened to traffic in early 2013. It is a vertical-lift bridge with a height comparable to the Pont de pierre in closed position and to the Pont d'Aquitaine in open position.

All five road bridges, including the two highway bridges, are open to cyclists and pedestrians, as will be the Pont Simone Veil.

For more information on companies in this article

Related Content

  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • Kuwait Fund loans Sri Lanka US$35m for bridge reconstruction
    December 11, 2014
    Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges. The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province. The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • Czech minister Tok warns Eurovia to speed up D1 bridge repairs
    January 8, 2015
    The Czech transport minister has given construction firm Eurovia until April to start repairs on two bridges it built or face having its bank guarantees withdrawn. Transport Minister Dan Tok, who until December was the chief executive of Skanska in the Czech Republic, said he would call for a new tender for the repairs if no action is taken by Eurovia, according to a report by the Czech internet news portal iDNES. Tok said that the road bridges constructed six years ago on the D1 motorway slip road in