Skip to main content

Bordeaux gets sixth bridge, Simone Veil Bridge, formerly JJ Bosc

The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River. The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge. The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.
July 11, 2017 Read time: 2 mins
The proposed Simone Veil Bridge in Bordeaux (photo courtesy of OMA REM Koolhaas-Clement Blanchet Architects)

The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River.
 
The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge.

The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.

The consortium led by civil contractor Razel-Bec includes 217 Fayat TP for the earthworks, drainage works and roads and utilities, Sefi intrafor for the special foundations, ETPO for in-river works, Baudin Chateauneuf together with Barbot for roof-framing works.
 
The bridge, as designed by Rem Koolhaas and Clément Blanchet of OMA architecture firm, will accommodate various forms of urban mobility and “constitutes both a link and a living space”.
 
A video focusing on design of the bridge is available on the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Facebook page of OMA Facebook page of OMA Link false http://www.facebook.com/pg/razelbecfayat/videos/?ref=page_internal false false%>.

Until Veil’s death in June, the bridge was to be called the Jean-Jacques Bosc Bridge after the prominent 19th century Bordeaux businessman and politician.

Simone Veil was a French lawyer and politician who served as minister of health under French president Valéry Giscard d'Estaing from 1993 to 1995. She was also president of the European Parliament and a member of the Constitutional Council of France.

Bordeaux has five road bridges across the Garonne. The oldest is the Pont de pierre, built in the 1820s and three modern bridges built after 1960: the Pont Saint Jean, the suspension Pont d'Aquitaine and the Pont François Mitterrand. Aquitaine and Mitterand bridges are part of the Bordeaux the ring road.

The fifth bridge, the Pont Jacques-Chaban-Delmas, was finished was opened to traffic in early 2013. It is a vertical-lift bridge with a height comparable to the Pont de pierre in closed position and to the Pont d'Aquitaine in open position.

All five road bridges, including the two highway bridges, are open to cyclists and pedestrians, as will be the Pont Simone Veil.

For more information on companies in this article

Related Content

  • PPRS event: Road users’ concerns at the heart of the programme
    December 19, 2014
    Europeans are in two minds about whether their road transport has improved in the past five years, according to the latest European Commission’ Eurobarometer survey and report. According to 38% of respondents, road transport quality had gone up, but 40% said it had dropped, while 18% said there had been no change. Whatever the opinion on quality, 60% of respondents to the report’s survey considered congestion to be the most serious issue facing Europe’s roads. The survey highlighted the dominance o
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • Bentley announces finalists for the 2017 Be Inspired Awards
    August 11, 2017
    AECOM, Arcadis-WSP/PB, CH2M-Fairhurst and Highways England are among the finalists for this year’s Bentley awards for outstanding use of BIM – building information modelling. Bentley Systems, a provider of infrastructure software solutions, said that the winners will be announced at The Year in Infrastructure 2017 Conference to be held in Singapore this year, October 10-12. “The annual awards honour the extraordinary work of Bentley users advancing infrastructure design, construction, and operations through
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.