Skip to main content

BESIX-MTH awards Nordhavn work to Bravida

Bravida Denmark, on behalf of the BESIX-MTH joint venture, will install plumbing, electricity, ventilation, road lighting and light signals for Copenhagen’s Nordhavn Tunnel.
By David Arminas February 5, 2024 Read time: 2 mins
Preparation work started last May on the 1.4km-long Nordhavn Tunnel which will be an extension of a 620m-long cut-and-cover tunnel that is part of the Nordhavnsvej project (image courtesy the Danish Road Directorate, Vejdirektoratet)

The BESIX-MTH joint venture has appointed Bravida Denmark for installation work on the Nordhavn Tunnel project in Copenhagen.

The project, worth more €26.7 million, includes a new stage from Svanemøllen to Nordhavn. Design and planning work is already underway, with production set to start in 2024 and expected completion in summer 2027.

Bravida's work includes installation of plumbing, electricity, ventilation, road lighting and light signals, said Nikolaj Bøhmer Jensen, a regional director at Bravida Denmark.

Bravida is a subcontractor to the joint-venture partnership BESIX-MTH and has worked in close collaboration since the project’s start, noted Michael Benedict Thulstrup, deputy project director at BESIX-MTH. The joint venture also is working closely with one of Denmark’s largest infrastructure contractors, MT Højgaard Danmark and together have worked on Stockholm’s E4 tunnel.

The Nordhavn Tunnel will offer more direct access to the urban development areas in both outer and inner Nordhavn. It will also improve access to harbour activities in the area and divert a significant portion of heavy traffic from Østerbro's road network.

Vejdirektoratet, the Danish Road Directorate, in collaboration with the city of Copenhagen and By & Havn, is overseeing the construction of the Nordhavn Tunnel. By & Havn is tasked with developing Ørestad and the port of Copenhagen  and runs the daily operations of the port through its subsidiary, Copenhagen Malmö Port.

Preparation work started last May on the 1.4km-long Nordhavn Tunnel which will be an extension of a 620m-long cut-and-cover tunnel that is part of the Nordhavnsvej project.

The Nordhavnsvej – or Northern Harbour Link - is a 3km-long four-lane two-tube bypass being built between Nordhavn and Helsingørmotorvejen (Elsinore Highway) in northern Copenhagen, Denmark. At €$323 million, the project was Copenhagen’s largest road infrastructure project in the past 50 years. The road runs through the heavily populated downtown district and improves the connection between the Helsingør motorway and the northern port area of the capital city.

Nordhavnsvej Consortium comprised E Pihl & Søn and Ed. Züblin is responsible for the construction and operation of the project, and includes five-year maintenance of the tunnel. Formwork design and installation was done by PERI Group.

Ramboll was the client’s general consultant responsible for all phases of the project, from planning, preliminary design and environmental impact assessment to tender design and supervision.

For more information on companies in this article

Related Content

  • Turkey’s important new tunnel will improve transport links
    May 18, 2016
    Major advances in tunnelling will allow cars to travel underneath the Bosphorus sea channel in Turkey's Istanbul next year when its third road link is opened, writes Adrian Greeman. The Bosphorus is redolent with history and strategic significance. As one of the world's most significant sea connections, linking the landlocked Black Sea to the Marmara Sea and the Mediterranean beyond, it has been vitally important for trade and crucial for military access. It is also one of the biggest obstacles for land tra
  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Further delays expected for the Fehmarn Belt Fixed Link
    August 26, 2015
    Further delays to the planned Fehmarn Belt Fixed Link between Germany and Denmark appear likely because of objections to the project during the planning stages, Danish media reported. Government authorities in the German state of Schleswig-Holstein indicated that permission for the project, which focusses on a 17km immersed road and rail tunnel, will probably be given in 2017, and not next year as previously believed. German authorities have received about 3,100 objections to the project that has rise