Skip to main content

BAM, Morgan Sindall start UK’s €112 million Oldbury viaduct job

A joint venture of BAM, Morgan Sindall and VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway. The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city. Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.
July 31, 2017 Read time: 2 mins
M5 junctions 1 and 2 in need of repair and waterproofing

A joint venture of 7456 BAM, 2567 Morgan Sindall and 2849 VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway.

The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city.

Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.

Damaged concrete will be repaired and a new waterproofing layer added prior to resurfacing. The process will then be repeated on the northbound carriageway, said Matt Atkinson, project director for the joint venture.

Various sections of the M5 through the West Midlands are elevated – viaducts – that were made of concrete in the late 1960’s. The Oldbury viaduct carries 120,000 vehicles a day, according to 8100 Highways England, the government agency responsible for major roads in England.

“This scheme is the largest concrete repair project ever undertaken in the UK,” the agency said. “To carry out concrete repair and joint replacement works safely, we will need to scaffold under most of the 2.9km long, 30m wide viaduct. All of our scaffolding will then be encapsulated in polythene to prevent the escape of water, dust and debris.”

For more information on companies in this article

Related Content

  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track
  • UK’s A14 upgraded route opening early
    October 14, 2019
    A key section of the UK’s important A14 upgrade project is opening to traffic ahead of schedule. Work to deliver the new stretch of dual carriageway for the A14 bypass is being completed a full 12 months early. The bypass section will open to drivers in December 2019, cutting congestion and journey times. Work on the 19km bypass section commenced in October 2016 and forms part of a programme of 33.6km of road works in Cambridgeshire, costing £1.5 billion. The road building project has been carried out by