Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • IRF Launches New Website for World Road Statistics
    April 6, 2017
    The International Road Federation Geneva Programme Centre (IRF Geneva) has been publishing the IRF World Road Statistics (WRS), the most complete and authoritative source of data for the international road, traffic and inland transport sectors for over 50 years. For 2017, IRF Geneva is pleased to announce the launch of a new website (www.worldroadstatistics.org) dedicated to the World Road Statistics. This new website provides all the information about the WRS including the methodology; contents of sections
  • A rough ride for Denmark’s National Road Directorate
    November 1, 2019
    Denmark’s National Audit Office has criticised the Danish National Road Directorate for consistently miscalculating the level of investment required for road projects. The Road Directorate – Vejdirektoratet - used 33% less than budgeted for road projects from 2007-2017. The audit office said that "budget calculations by the transport ministry, including the Road Directorate, have not been accurate enough". Jens Holmboe, head of the Road Directorate, rejected the criticism, saying that the Audit Office
  • HeidelbergCement investigates the binding of CO² in minerals
    August 1, 2017
    German building materials producer HeidelbergCement and Aachen2222 University of Applied Sciences are investigating the absorption of CO² from flue gas by olivine and basalt. The carbonised minerals could be used as a value-added additive in the production of building materials.
  • 4x4 Canter is start turn on Mercedes Benz stand
    January 6, 2017
    A 4x4 version of Mitsubishi’s Canter light truck premiered at INTERMAT on the stand of its sister company Mercedes Benz, which distributes the vehicles in Europe. The 6.5tonne GVW vehicle is fitted with a transfer box that diverts half of the torque to the front wheels at the touch of a button and can be engaged while still on the move.