Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • 4x4 Canter is start turn on Mercedes Benz stand
    April 19, 2012
    A 4x4 version of Mitsubishi’s Canter light truck premiered at INTERMAT on the stand of its sister company Mercedes Benz, which distributes the vehicles in Europe. The 6.5tonne GVW vehicle is fitted with a transfer box that diverts half of the torque to the front wheels at the touch of a button and can be engaged while still on the move.
  • Improvements for UK road link
    February 27, 2023
    Improvements are planned for an important UK road link.
  • Dynapac is offering new pavers to meet future emissions requirements
    January 6, 2017
    Dynapac continues to innovate with its paver range, following from previous developments in 2010 and 2011. The firm says it is now improving the operator´s environment and transport sizes, as well as gearing up to meeting future exhaust emission regulations. The firm introduced six new tracked asphalt pavers with paving widths of 2-14m. Of these, the four sophisticated PLC-controlled pavers SD2500 C / SD2500 CS / SD2550 C / SD2550 CS are designed to meet the needs of contractors, communities and rental comp
  • Dynapac is offering new pavers to meet future emissions requirements
    April 12, 2012
    Dynapac continues to innovate with its paver range, following from previous developments in 2010 and 2011. The firm says it is now improving the operator´s environment and transport sizes, as well as gearing up to meeting future exhaust emission regulations. The firm introduced six new tracked asphalt pavers with paving widths of 2-14m. Of these, the four sophisticated PLC-controlled pavers SD2500 C / SD2500 CS / SD2550 C / SD2550 CS are designed to meet the needs of contractors, communities and rental comp