Skip to main content

Autobahn bridge in Bavaria demolished with explosives (VIDEO)

A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlle
July 1, 2013 Read time: 2 mins
A demolition contractor in the north of Bavaria recently used 200kg of explosives to demolish an old autobahn viaduct. Situated close to the town of Bad Kissingen and to the north of the city of Nuremberg, the 46 year old A7 viaduct had reached the end of its working life and a new structure had been built alongside in this scenic rural area. Pre-weakening work had been carried out using hydraulic breakers along with drilling the necessary blastholes, to ensure the supports and deck collapsed in a controlled fashion. Traffic on the new viaduct was halted briefly by the police for the duration of the blast, which was carried out safely and successfully by the contractor. An enterprising local farmer had clearly allowed spectators to congregate in a field on the nearby hillside to watch the demolition, while coffee and beer were being sold to those with a thirst.

Related Content

  • Indeco: Attached to growth
    July 4, 2023
    Attachment specialist Indeco notes a growing demand for products compatible with smaller-sized excavators, with the company looking to increase its range in response to this market trend.
  • Genoa’s San Giorgio Bridge set to open
    July 31, 2020
    Contractor Webuild has been completing work, including solar panel installation.
  • New Argentina highway construction work
    January 11, 2019
    Construction is underway for Argentina’s new Mendoza-San Juan Highway – Mauro Nogarin reports The rehabilitation and maintenance works of more than 3,300km of routes is now underway in Argentina. This followed on after the takeover of six new road corridors under the Public-Private Partnership (PPP) model, which took place in August 2018. The rehabilitation and maintenance works are being carried out prior to the start of the main projects, which will include the construction of highways. Building the
  • Strong performance sees Wirtgen Group bullish
    September 30, 2014
    The Wirtgen Group reports that strong financial performance is expected for 2014. Full results are not yet available for 2014 but the privately held, family owned firm is confident for good results. Joint president Jürgen Wirtgen said, “Sales for 2014 will reach €1.95 billion.” He explained that for the first half of 2013, turnover reached €285 million, whereas for the first six months of 2014, turnover reached €329 million, a jump of 15%. The second half of the year is also looking healthy with the firm on