Skip to main content

Astaldi expects to close €1.7bn Russian motorway build deal

Italian civil engineering group Astaldi is expecting to obtain a €1.7 billion contract from Russia that would see them build a 140km stretch of the Moscow-St Petersburg motorway. Astaldi chairman Paolo Astaldi said that the deal for lots seven and eight of the motorway is “probable”. Astaldi is in a consortium with Turkish partner Ictas, with which it has already banked deals in Russia. The contract will be awarded by the motorway concessionaires, VTB and Vinci.
May 13, 2014 Read time: 1 min
Italian civil engineering group 1324 Astaldi is expecting to obtain a €1.7 billion contract from Russia that would see them build a 140km stretch of the Moscow-St Petersburg motorway.

Astaldi chairman Paolo Astaldi said that the deal for lots seven and eight of the motorway is “probable”. Astaldi is in a consortium with Turkish partner Ictas, with which it has already banked deals in Russia. The contract will be awarded by the motorway concessionaires, 3012 VTB and 5177 Vinci.

For more information on companies in this article

Related Content

  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Egis has been awarded a major Turkish highway deal
    June 25, 2013
    Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish