Skip to main content

Astaldi expects to close €1.7bn Russian motorway build deal

Italian civil engineering group Astaldi is expecting to obtain a €1.7 billion contract from Russia that would see them build a 140km stretch of the Moscow-St Petersburg motorway. Astaldi chairman Paolo Astaldi said that the deal for lots seven and eight of the motorway is “probable”. Astaldi is in a consortium with Turkish partner Ictas, with which it has already banked deals in Russia. The contract will be awarded by the motorway concessionaires, VTB and Vinci.
May 13, 2014 Read time: 1 min
Italian civil engineering group 1324 Astaldi is expecting to obtain a €1.7 billion contract from Russia that would see them build a 140km stretch of the Moscow-St Petersburg motorway.

Astaldi chairman Paolo Astaldi said that the deal for lots seven and eight of the motorway is “probable”. Astaldi is in a consortium with Turkish partner Ictas, with which it has already banked deals in Russia. The contract will be awarded by the motorway concessionaires, 3012 VTB and 5177 Vinci.

For more information on companies in this article

Related Content

  • New Bosporus crossing construction commencing
    June 3, 2013
    Work to construct the new Bosporus crossing in Turkey is now underway. This will be Istanbul's third bridge over the Bosporus and is aimed to open for traffic within two years. Construction is being carried out by a consortium that includes Italian company Astaldi and Turkish firm IC Ictas. The project is expected to cost in the region of US$5.83 billion. The bridge will carry eight highway lanes as well as two rail lines. When complete it will be longest suspension bridge in the world that carries rail lin
  • Russia’s US$28 billion road and bridge works
    November 29, 2013
    A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc
  • Poland bidders angry over Astaldi win for Warsaw Ring Road work
    June 18, 2015
    Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
  • Consortium wins third Bosphorus bridge deal
    December 3, 2012
    A consortium formed by ICTAS of Turkey and the Italian firm Astaldi has won a tender to build a third suspension bridge over Istanbul’s Bosphorus. Despite criticism from planners and environmentalists, the 1.3km structure, the longest over the strait, has been given the go-ahead by Turkey’s Transport Minister, Binari Yildirim. A joint venture of local company IC Içtas Insaat and Italian Astaldi has won the tender for the project, and Minister Yildirim is reported as saying the bridge would be built in three