Skip to main content

Astaldi begins drilling tunnels on Poland’s S7 dual carriageway

Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
March 14, 2017 Read time: 2 mins
Italian contractor 1324 Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland.

Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long.

Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016

Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

In 2015, Italian firm Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of of this year. Meanwhile, a consortium headed by Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

For more information on companies in this article

Related Content

  • Mirbud awarded ring road contract for Olesno, Poland
    April 4, 2019
    Mirbud has been awarded a €155 million contract to build a 25km ring road around the Polish town of Olesno. The ring-road will be part of a new S11 expressway. Other companies which competed for the contract include Strabag, Budimex, Porr and Polaqua. Olesno, with a population of around 10,000, lies about 40km from the city of Opole in southwestern Poland.
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Strong interest in Slovakia highway project
    June 22, 2015
    Strong interest is being shown in a major highway project in Slovakia. The tender process is attracting a series of bidders for what will be Slovakia’s largest ever highway contract. The project is expected to be worth some €4.53 billion in all and involves the construction of a bypass around capital Bratislava. A series of major firms are interested in the bidding including China Communications Construction Company (CCCC), a consortium headed by VINCI Concessions and a consortium comprised of Bouygues Tra
  • Polish road dispute
    March 2, 2012
    Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.