Skip to main content

Astaldi begins drilling tunnels on Poland’s S7 dual carriageway

Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
March 14, 2017 Read time: 2 mins
Italian contractor 1324 Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland.

Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long.

Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016

Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions.

The north-south S7, when completed, will run 720km from Gdańsk on the Baltic coast through Elbląg, Warsaw, Radom, Kielce and Kraków to Rabka near Poland’s southern border with Slovakia. The vast majority of construction will be upgrading National Road 7 (DK 7).

The S7 is part of European route E77, in turn part of the inter-European road system, starting in north-eastern Russia and running 1,690km through the Baltic Sea states, into Poland and connecting with central Europe.

Astaldi’s highways division has been particularly active in Turkey – the Mount Bolu Tunnel, the Izmit Bay Bridge and, in Istanbul, the Third Bosphorus Bridge.

In 2015, Italian firm Salini Impregilo started construction of a 21.5km stretch of the S7 between the Jedrzejow and Checiny junctions under a deal worth nearly €144.67 million. Completion is set for the third quarter of of this year. Meanwhile, a consortium headed by Budimex won a contract worth nearly €318.28 million for the construction of a 9.7km section of the S7 between Ostroda Polnoc and Ostroda Poludnie.

In 2014, a Strabag consortium, picked up a €127.93 million contract for a 4.5km section of the S7 dual carriageway near Krakow, including construction of a bridge over the Vistula River.

For more information on companies in this article

Related Content

  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Poland: Intercor wins S3 dual carriageway contract
    April 2, 2015
    Przedsiebiorstwo Uslug Technicznych Intercor has been awarded a contract to build the second section of the S3 dual carriageway. The 11.6km section will stretch from Przeszkody to Paszkow and cost around €106 million (nearly US$116 million). The S3 will run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica to the border with the Czech Republic, where it will connect to the D11 motorway.
  • Egis has been awarded a major Turkish highway deal
    June 25, 2013
    Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish
  • Polish dual carriageway contracts being agreed
    February 18, 2020
    Two important dual carriageway contracts are being agreed in Poland.