Skip to main content

AmeySRM awarded UK's A533 bridge work

Under the €23 million contract work will start early 2021 for completion in summer 2022.
By David Arminas July 14, 2020 Read time: 2 mins
The two-span replacement will be adjacent to an existing bridge over the M56

Highways England and Amey Sir Robert McAlpine (AmeySRM) have signed a contract for construction of a new A533 Expressway Bridge replacement in the UK.

Under the €23 million contract work will start in spring 2021 for completion in summer 2022.

The existing 70m span bridge carries the A533 Expressway over the M56 motorway in the northwest of England. But it has reached the end of its life, according to AmeySRM, a cooperation between contractors Amey and Sir Robert McAlpine.

The  two-span replacement will be constructed adjacent to the existing bridge and have much improved cycling and pedestrian facilities, noted Robert Allen, framework partnership director for AmeySRM. “This scheme is one of a number of comprehensive upgrades our collaborative approach as AmeySRM is delivering across the northwest, creating better journeys for those using the network,” said Allen.

To ensure that the works cause minimal disruption, the main concrete bridge deck will be assembled off site in a nearby compound then transported and lowered into its final position using a self-propelled modular transporter. Once the new bridge is open to traffic, the existing structure will be demolished and the area fully reinstated.

AmeySRM is already involved in a €47.3 million overhaul of junction 19 of the M6 motorway near Rugby in central England. Work includes construction of a new bridge through the existing roundabout and over the M6, creating a better flow between the motorway and the A556 highway. AmeySRM was awarded the scheme by Highways England and is one of 13 companies – known as Delivery Integration Partners – which are now working on 18 projects.

Amey is part of the services division of Spanish global infrastructure group Ferrovial.

For more information on companies in this article

Related Content

  • Athabasca’s Hwy 813 bridge to be replaced
    May 16, 2022
    The new bridge over the Athabasca River in the Canadian province of Alberta will include two 3.7m-wide lanes with 1.8m-wide shoulders on either side as well as a pedestrian sidewalk.
  • First bridge deck section joined on UK’s Mersey Gateway project
    June 30, 2017
    The Mersey Gateway bridge project near Liverpool in England passed a milestone recently with the first joining of two of the deck sections.
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Bridge replacement assembled overnight
    February 21, 2012
    Highways service provider Balfour Beatty Mott MacDonald has completed a major milestone in a project to replace a bridge for use by the local community over the M5 motorway near the city of Bristol, south-west England.