Skip to main content

Algeria tunnel project nearly complete

Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced. The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway. To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to sup
June 9, 2016 Read time: 1 min
Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced.

The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway.

To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to support the tunnel profile during the excavation work.

Related Content

  • Tuen Mun to Chek Lap Kok Tunnel project
    December 22, 2016
    It is not only the scale of the Tuen Mun to Chek Lap Kok tunnel that impressed delegates but the number of novel technologies that Dragages Hong Kong, a Bouygues Construction subsidiary, is employing on this project. The 4.6 km tunnel running 60m below sea level is part of a strategic new route linking Hong Kong’s airport on Lantau Island and the New Territories. Dragage’s contract includes reclamation of 16.5-hectares at the tunnel’s north end to accommodate the north portal and a ventilation building. Wo
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b