Skip to main content

Algeria tunnel project nearly complete

Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced. The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway. To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to sup
June 9, 2016 Read time: 1 min
Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced.

The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway.

To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to support the tunnel profile during the excavation work.

Related Content

  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • US$4.6 billion Atlanta road project nears completion
    September 24, 2024
    A US$4.6 billion road project in Atlanta, Georgia is nearing completion.
  • Peri has Polish bridge covered
    February 6, 2012
    A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used. Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.
  • New highway connection for Algeria
    September 4, 2012
    A major new expressway will link Tizi-Ouzou in Algeria to the country’s East-West highway. The local authorities have been given a budget of US$623 million for the project. The expressway will connect to the East-West highway at Bouira. The project forms part of the 2010-14 five year plan and is required as the existing route linking Tizi-Ouzou to the East-West highway, the TN 12, is now carrying more vehicles than it was designed for.