Skip to main content

Algeria tunnel project nearly complete

Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced. The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway. To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to sup
June 9, 2016 Read time: 1 min
Work on a major tunnel project in Algeria is due for completion shortly. The tunnel will commence carrying traffic during July 2016, although an official inauguration date has not so far been announced.

The T4 tunnel will connect Constantine with Skikda and Annaba, which lie to the north and on Algeria’s coast. The 2.5km tunnel forms a section of the East-West highway.

To cope with the tricky geological conditions in the area, both umbrella arch and composite roof bolting methods have been used to support the tunnel profile during the excavation work.

Related Content

  • Agua Negra tunnel between Chile and Argentina
    May 15, 2014
    The current Paso de Agua Negra is the highest border crossing between Chile and Argentina. On the Argentine side, the Agua Negra Pass is located at 4,765m above sea level and 260km from the city of San Juan in the province of San Juan in the north-west of the country. On the Chilean side, the pass lies 229km from the city of La Serena in the Coquimbo region. The pass can be accessed from the Argentine side via National Highway No 150 from the province of La Rioja, which runs for a total of 390km. From the C
  • Brazil Tamoio highway and São Sebastião tunnel work
    July 5, 2016
    Brazil’s Tamoio Highway and São Sebastião tunnel construction is of major importance – Mauro Nogarin reports. The modernisation and expansion of Brazil’s Tamoio highway is a major project for Brazil. The project has an estimated cost of $1.5 billion and work on the first section from Planalto was completed in January 2014, costing around $350 million. The project is being managed by the state-owned agency DERSA, which deals with road development. According to the concessionaire for the Tamoios highway p
  • East-West Highway from Constantine to Annaba, Algeria ready by summer 2013
    February 4, 2013
    Algerian transport minister Amar Ghoul says the stretch of the East-West Highway linking Constantine to Annaba via Skikda will be completed by summer 2013. The works will be completed in stages, with the first part, between Constantine and Skikda, set to be operational by March 2013 at the latest. Once the stretch is fully completed, users will be able to travel from Tlemcen to Annaba via the East-West Highway. Ghoul said that all the financial and technical constraints that had hindered progress of the wor
  • South German road tunnel project to restart
    July 26, 2018
    Construction work on the Kramertunnel in South Germany is to restart. The tunnel is needed to help reduce traffic delays in the town of Garmisch-Partenkirchen in the southern German state of Bavaria and with lies next to the border with Austria. The twin tube tunnel stretches will both be around 2.8km long and the project will also include building six bridges as part of the new bypass around the town. The new bypass, with its tunnel and bridges, is required as traffic jams occur regularly in the town on th