Skip to main content

Fugro consulting for Amsterdam Zuidasdok project

Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are Fluor, Heijmans and HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it. The A10 South is one of the busiest highways in The Netherlands and
March 2, 2017 Read time: 2 mins
6202 Fugro is providing the consultancy services for the Zuidasdok project in Amsterdam. The firm will work with the ZuidPlus partners, which are 6343 Fluor, 1271 Heijmans and 981 HOCHTIEF. The Zuidasdok project is of major importance as it is one of the largest infrastructure developments in the Netherlands. The project includes developing the A10 South highway, which comprises widening the route and contructing a cut and cover tunnel for a portion of it.

The A10 South is one of the busiest highways in The Netherlands and suffers heavy congestion at peak periods, particularly at junctions S108 and S109 often during rush hour. The new proposed highway will be extended to eight lanes for through traffic and four lanes for local traffic. Improvements will also extend to the ‘De Nieuwe Meer’ and ‘Amstel’ junctions and include the construction of a new Amsterdam South railway station.

The Zuidasdok project is essential for accessibility to the Zuidas business district. Placing a stretch of the highway in a tunnel will provide space for a new public area and the new Amsterdam South railway station, turning it into a public transport hub. Due to the interconnected nature of the urban road and rail network, the Zuidasdok is a joint project of the Municipality of Amsterdam, the Dutch Rail Infrastructure Manager (ProRail) and Directorate-General of Public Works and Water Management (Rijkswaterstaat).

As a strategic partner to the ZuidPlus partners, Fugro will provide monitoring expertise, geotechnical risk management consulting services, soil investigations and data acquisition throughout the re-baseline phase and ultimate realisation of the project. Fugro and ZuidPlus will use a sophisticated monitoring approach to manage geotechnical risk.

Planning and construction will commence in 2019 and the project is expected to be completed around 2028.

For more information on companies in this article

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • BESIX buying STRABAG’s Netherlands subsidiary
    February 1, 2021
    BESIX is buying STRABAG’s Netherlands-based subsidiary.
  • More tenders for the Lower Thames Crossing
    April 2, 2021
    The winners will build 23km of road connecting to what will be the UK’s longest road tunnel.
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.