Skip to main content

Software developments aids construction projects

Liebherr claims its wide range of Litronic control system featuring CANUS software ensures construction projects are delivered on time and to budget. The system’s PDE data recording unit logs information such as depth, suspension levels, drilling speed and geometry. It then displays it in real-time via a colour touchscreen in the operator's construction machine cab. Due to constant awareness of the working process, the operator is able to adapt the PDE unit to suit changing environmental conditions. PDE rec
March 21, 2012 Read time: 2 mins
718 Liebherr claims its wide range of Litronic control system featuring CANUS software ensures construction projects are delivered on time and to budget.

The system’s PDE data recording unit logs information such as depth, suspension levels, drilling speed and geometry. It then displays it in real-time via a colour touchscreen in the operator's construction machine cab.

Due to constant awareness of the working process, the operator is able to adapt the PDE unit to suit changing environmental conditions. PDE recorded project work can be transferred onto a PC by way of a CompactFlash memory card or automated via Liebherr’s LiDAT software.

Meanwhile, customised PDR software-generated report templates can be applied to major deep foundation methods, and are available in a wide selection of languages. The reports can be printed out directly or stored as PDF files. In addition, the Load Recorder feature of the PDR can be used to evaluate handled masses per period of time. The findings of data recordings help with the training of machine operators, and information generated on handled masses helps organise the handling of cargo in harbours.

Liebherr’s LiDAT software produces data for construction machines, such as the date and time it leaves a predefined zone, its use in unauthorised time periods, its fuel consumption and its service intervals. Critical information is sent immediately by e-mail to appropriate managers in their respective language. Service technicians can also use LiDAT to directly log in to a specific machine to analyse arising problems and to provide solutions quickly, without having to travel to the machine itself.

Finally, the Crane Planner Liebherr-Werk Nenzing offers a web-based software tool to aid the selection of the ideal crane for a specific construction job, through a virtual 3D world based on human inputted requirements.

For more information on companies in this article

Related Content

  • Road construction software innovations
    February 13, 2012
    A range of key software innovations are now available for road construction applications from various suppliers - Adrian Greeman writes. Two significant and highly economic alternatives are now available to the major CAD providers both from Belgium and both offering interesting features. First is Pythagoras, which describes itself as a modern CAD program specially designed for topographical applications which include land surveying, road design and city planning.
  • Traffic management software tools
    March 5, 2012
    A joint development project between Delcan Corporation and Intelligent Devices Incorporated (IDI) has resulted in the sophisticated Intelligent NETworks product. This is an integrated product that combines the IDI Intelligent Control NTCIP system with the Delcan advanced transportation applications of NETworks. The system can be linked to dynamic message signs (DMS), CCTV and vehicle detector stations (VDS), traffic intersections, as well as environment road weather sensor stations.
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.
  • Smart system for recording road repairs
    May 25, 2016
    The new Site-Track system is said to offer a sophisticated tool for tracking road repairs. The system can be used for identifying new installation or repairs for utilities and recording all utilities in the immediate area of the installation. The package offers a method of relocating previously recorded information rapidly, without the need for advanced skills or technologies such as GPS and is said to be invaluable for night-time or emergency works. The package can provide accurate location of critica