Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Egis wins Olympic gold in Briançon
    July 25, 2025
    Egis will project manage a dedicated public transport lane for the RD1091 in the Hautes-Alpes department of the French Alps for the 2030 Olympic and Paralympic Winter Games in Briançon and the Serre-Chevalier valley.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Doosan’s new 42tonne crawler excavator
    April 11, 2013
    The new Stage IIIB compliant DX420LC-3 large crawler excavator has been unveiled by Doosan Construction Equipment. Compared to the model it replaces, the new excavator is said to offer several improvements, including a substantial boost in power, resulting in significant increases in performance specifications such as drawbar pull, arm and bucket digging forces and lifting capacities to provide a much higher overall productivity. The DX420LC-3 excavator is designed to handle a broad range of applications s
  • Building New zealand's landmark tunnel
    February 15, 2012
    A landmark tunnelling project is commencing in New Zealand - Kristina Smith reports. New Zealand is preparing to embark on its biggest transport project ever. In August it announced that it had selected its preferred bidder for the NZ$1.4 billion Waterview Connection in Auckland, 5km of new motorway connecting highways to the North and South of the city.