Skip to main content

Parsons is handling a major interchange project in North Carolina

Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
June 21, 2017 Read time: 2 mins
RSS

3220 Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the 4027 North Carolina Department of Transportation (NCDOT).

It involves carrying out design services under a planning and design limited services contract for the I-26/US 74/NC 108 interchange improvement, located in Polk County, North Carolina. The project will provide ramp connections between westbound I-26 to eastbound US 74 and westbound US 74 to eastbound I 26. The work also involves the modernisation of NC 108 from west of Old Highway 19 to the intersection of Walker Road in Columbus.

Direct connections between the two major routes will lower congestion at the interchange, where interstate through-traffic is currently forced to exit the highway and travel through roundabouts on NC 108 before entering either US 74 or I-26.

Parsons and its team members will be responsible for all final designs, including National Environmental Policy Act documentation, as well as participation in public involvement activities.

The improvements to the I-26/US 74 ramps are scheduled to open prior to the Federal Equestre Internationale World Equestrian Games, which will be held in North Carolina in September 2018.

For more information on companies in this article

Related Content

  • Mersey Gateway: Consortia Talks
    April 4, 2012
    The competitive dialogue phase of the Mersey Gateway Project has begun. The project team are said to have held initial meetings with the three shortlisted bidding consortia, and will be working closely with each of them over the coming months. The aim is for each of the three bidders to submit their detailed proposals by the end of 2012, with an announcement about a preferred bidder likely to come in spring 2013. The value of the construction phase of the project, including land, is estimated at US$961milli
  • Philippines implementing transport projects
    March 3, 2017
    A series of major highway projects are now being implemented in the Philippines. Key projects being implemented close to Davao City include the US$380 million Davao City-Panabo City bypass, the $537.5 million Coastal Road and two flyovers worth $14 million in total. The bypass project will cut journey times and includes the construction of a tunnel section, with a portion of the funding being provided by the Japan International Cooperation Agency (JICA). The new coastal route will also cut congestion and jo
  • FGinal stage of Florida project
    July 28, 2016
    Work is now commencing on the final stretch of the Wekiva Parkway, State Road 429, in Florida. This will be the fifth section of the parkway, with the work being managed by the Central Florida Expressway Authority (CFX). Section 2A will stretch 3.2km and the construction work expected to be complete in January 2018. This US$38.65 million project will be located north of Haas Road between Plymouth Sorrento Road and County Road 435 (Mount Plymouth Road). Section 2A will connect to Section 2B, the systems int
  • R&W takes in-house the recycling of dry and wet waste
    January 15, 2016
    With the introduction of EU regulations in 2012 controlling the disposal of dry and wet waste from road sweepings and gully waste and it is not acceptable to send this material to landfill. Many local authorities have had to find an alternative solution. R&W Civil Engineering in the southern UK country of Hampshire, is a specialist in highway construction, maintenance and other transport related services. It, along with other contractors started transporting waste material to the nearest processing stati