Skip to main content

VIDEO: US bridge removed with explosive demolition

September 28, 2015
A defunct bridge has been removed in the US State of Louisiana using explosive demolition techniques. The OK Allen Bridge was removed at the weekend, following a planned blast carried out by a demolition specialist. The bridge psanned the Red River for 79 years, providing a connection between Alexandria and Pineville. Traffic was halted on the Curtis-Coleman Bridge, which carries US 71, for safety during the demolition. The steelwork of the old bridge will be removed from the river and sold for scrap, although its concrete piers still have to be demolished. Meanwhile a new structure will be constructed on the site of the old bridge as part of the Curtis-Coleman link.

Related Content

  • New Paraguay-Brazil bridge being built
    July 1, 2020
    Construction work is now underway on a new Paraguay-Brazil bridge.
  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • VIDEO: Demolition starts to remove Kendray Bridge in Barnsley, UK
    August 4, 2015
    Demolition work has started of a 30-year-old bridge in the UK town of Barnsley in preparation for a €58 million revamp of the town centre.

    Kendray Street Bridge is the first structure to be knocked down to allow for the redevelopment, which includes a new town square, library and a refurbished market.
  • New bridge surfacing
    February 6, 2012
    A new wearing course applied by Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried o