Skip to main content

VIDEO: US bridge removed with explosive demolition

September 28, 2015
A defunct bridge has been removed in the US State of Louisiana using explosive demolition techniques. The OK Allen Bridge was removed at the weekend, following a planned blast carried out by a demolition specialist. The bridge psanned the Red River for 79 years, providing a connection between Alexandria and Pineville. Traffic was halted on the Curtis-Coleman Bridge, which carries US 71, for safety during the demolition. The steelwork of the old bridge will be removed from the river and sold for scrap, although its concrete piers still have to be demolished. Meanwhile a new structure will be constructed on the site of the old bridge as part of the Curtis-Coleman link.

Related Content

  • Explosive demolition works for US Bridge
    January 19, 2015
    A successful explosive demolition project for an old bridge has been carried out in the US state of Missouri. The Fairfax Bridge was constructed in 1935 and was no longer able to meet current transportation needs. Some 760m long the bridge was carrying around 6,000 vehicles/day. Another bridge was also opened nearby, the Platte Purchase Bridge, in 1957 to help the original structure carry the necessary traffic volumes. Removing the old structure of the Fairfax Bridge as well as the Platte Purchase Bridge and replacing them with a new bridge is costing around US$79 million.
  • Pittsburgh bridge blasted
    October 7, 2013
    Explosive demolition has been used to remove an old highway bridge in Pennsylvania. Some 90kg of explosives were used to blast the pre-weakened steel structure of the 87 year-old Masontown Bridge. The redundant steel truss structure lay just 3m from the new bridge now carrying Route 21 over the Monongahela River and connecting Masontown with Monongahela Township. The location of the explosives and the pre-weakening work carried out however meant that the old structure, built in 1925 and upgraded in 1933, fe
  • Demolition underway on bridge structure in Cleveland, Ohio
    June 9, 2014
    Demolition work is progressing on track on the old Innerbelt Bridge in the US city of Cleveland and spanning the Cuyahoga River. At present a demolition contractor is breaking up the structure in stages, using cutting gear and cranes to remove portions of the bridge in a phased programme of works. Once the demolition moves to a certain stage in a few months, the contractor will then be able to use explosives to demolish the remaining structure. Four of the truss bridge’s nine spans are being dismantled usi
  • German bridge demolition work assisted by Liebherr
    May 9, 2022
    Construction equipment from Liebherr has played an important role in the project to demolish a bridge in Germany.