Skip to main content

VIDEO: US bridge removed with explosive demolition

September 28, 2015
A defunct bridge has been removed in the US State of Louisiana using explosive demolition techniques. The OK Allen Bridge was removed at the weekend, following a planned blast carried out by a demolition specialist. The bridge psanned the Red River for 79 years, providing a connection between Alexandria and Pineville. Traffic was halted on the Curtis-Coleman Bridge, which carries US 71, for safety during the demolition. The steelwork of the old bridge will be removed from the river and sold for scrap, although its concrete piers still have to be demolished. Meanwhile a new structure will be constructed on the site of the old bridge as part of the Curtis-Coleman link.

Related Content

  • Danube bridge takes shape
    February 10, 2012
    A new bridge over the River Danube between Bulgaria and Romania is expected to benefit to the economies of both nations. Krasimir Krastanov reports
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Flyover replacement
    February 22, 2012
    French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of