Skip to main content

VIDEO: M6 motorway link taking shape between Knutsford and Bowdon

August 23, 2016
In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.
 
However, the need to keep open existing roads which cross the route of the new dual carriageway while it is being built means it has yet to be connected from end to end. Work to move these roads onto bridges over the new road is now underway.
 
The A50 from Mere, Chapel Lane from Bucklow Hill and Millington Lane – all with junctions along the existing A556 – are all currently running across the path of the new A556 with the route of the new road being excavated on either side of them.

Each of the roads will be realigned and moved onto newly-built bridges crossing the new dual carriageway - with the A50 work due for completion by 30 August. By then, all traffic heading between High Legh and Mere crossroads will have started using the new A50 bridge.

Work to run traffic over the new bridges at Chapel Lane and Millington Lane – as well as a new bridge providing farm access at Bentleyhurst Lane – will be done over the next few months.

From the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal drone&#8217;s eye view View the YouTube Video false https://www.youtube.com/watch?v=52j1OtBWolE false false%>, the project stretches well into the distance.

Related Content

  • Sunderland’s sliding bridge slips across the Wear
    October 26, 2016
    Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation next year likely. The project to build the New Wear Crossing is now half way through with the first half of the steel deck bridge poised mid-river. Completion of the bridge is expected in the spring of 2018. This month, hydraulic jack
  • Bigger and better INTERMAT show
    January 6, 2017
    INTERMAT is well-established as one of the biggest international shows for the construction equipment, machinery, technology and materials sector. This year INTERMAT and World of Concrete have pooled their expertise and reputations to launch World of Concrete Europe (WOC Europe). This collaboration will better meet the needs of the European concrete market by providing a comprehensive view of the sector.
  • Bigger and better INTERMAT show
    April 17, 2015
    INTERMAT is well-established as one of the biggest international shows for the construction equipment, machinery, technology and materials sector. This year INTERMAT and World of Concrete have pooled their expertise and reputations to launch World of Concrete Europe (WOC Europe). This collaboration will better meet the needs of the European concrete market by providing a comprehensive view of the sector.
  • Highways England goes green with Mobilane Green Screens
    May 22, 2018
    Highways England has installed a “green bridge” as part of the US$242 million A556 Knutsford to Bowdon dual carriageway project. Mobilane Green Screens are part of the innovative new feature. The project to improve links between the M6 and M56 includes seven new bridges plus a pedestrian underpass along the 7.3km new road. Other work includes concrete retaining walls and repairs to two existing bridges. The new dual carriageway will make travelling between the M6, south Manchester and Manchester Airport q