Skip to main content

VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike

October 17, 2016
Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.

The Pennsylvania Turnpike Commission sold most of the disused section to the Southern Alleghenies Conservancy for $1 in 2001. The crumbling concrete strip is now managed by Friends of the Pike 2 Bike, a coalition of non-profit groups.

Many videos exist of people walking and bicycling down the road and the images, while at once very scenic, are also very melancholic.

It was called the Tunnel Highway because of its seven tunnels: Blue Mountain, Kittatinny Mountain, Tuscarora Mountain, Sideling Hill, Rays Hill, Allegheny Mountain and Laurel Hill. There was one tunnel through each mountain and the highway was reduced to a single lane in each direction through each tunnel. These tunnels were originally built as part of the South Pennsylvania Railroad. One short tunnel was bypassed during the original construction of the Turnpike.

By the late 1950s, the turnpike was heavily congested. To alleviate the situation, there was twinning of four tunnels - construction a second, parallel, two-lane tunnel – and also bypassing and closure of the other three.

The tunnelled section was abandoned in 1968 when a new bypass route was built uphill and parallel to it.

But all is not lost. Videos exist of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal people travelling Visit www.youtube.com page false http://www.youtube.com/watch?v=OOP_QoizcWc#t=138.89297 false false%> the now abandoned section.

An especially good video shows how the tunnelled section %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal was built Visit www.youtube.com page false http://www.youtube.com/watch?v=1pYWj64bXk4 false false%>.

Related Content

  • INTERMAT launch for Topcon total stations
    January 6, 2017
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.
  • INTERMAT launch for Topcon total stations
    February 3, 2012
    A new range of reflectorless total stations has been developed by Topcon. Called the ES series, the new models also feature TSshield – a Topcon Group innovation using a multi-function telematics-based communication module that locates the instrument.
  • Premiere for SBM’s REMAX 1112 MAXI mineral processor
    February 13, 2013
    Austrian company SBM Mineral Processing, a member of the MFL Group, is showing for the first time its new mobile mineral processing plant. Expanding its REMAX series with the 41tonne mobile track-mounted REMAX 1112 MAXI plant, it is said to offer a completely redesigned material flow making material jamming “a thing of the past.” The company says the discharge conveyor belt below the screen can be optionally fixed or swivelled by 180° increasing stockpile capacity five-fold and considerably improving logist
  • More output for less fuel from Atlas Weyhausen’s new E Series compact wheeled loaders
    January 6, 2017
    Atlas Weyhausen’s new E Series wheeled loaders will be on display at Bauma with the AR 65e, AR 75e, AR 80e and AR95e Super all on view. Using newly developed Deutz engines, the new wheeled loaders offer up to 12% more output with lower fuel consumption figures. A key design feature of the engines is that they do not contain a particle filter and therefore are easier to maintain, claims the German manufacturer. There is a new steering valve on the E Series too, allowing operators to run the machine electroni