Skip to main content

VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike

October 17, 2016
Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.

The Pennsylvania Turnpike Commission sold most of the disused section to the Southern Alleghenies Conservancy for $1 in 2001. The crumbling concrete strip is now managed by Friends of the Pike 2 Bike, a coalition of non-profit groups.

Many videos exist of people walking and bicycling down the road and the images, while at once very scenic, are also very melancholic.

It was called the Tunnel Highway because of its seven tunnels: Blue Mountain, Kittatinny Mountain, Tuscarora Mountain, Sideling Hill, Rays Hill, Allegheny Mountain and Laurel Hill. There was one tunnel through each mountain and the highway was reduced to a single lane in each direction through each tunnel. These tunnels were originally built as part of the South Pennsylvania Railroad. One short tunnel was bypassed during the original construction of the Turnpike.

By the late 1950s, the turnpike was heavily congested. To alleviate the situation, there was twinning of four tunnels - construction a second, parallel, two-lane tunnel – and also bypassing and closure of the other three.

The tunnelled section was abandoned in 1968 when a new bypass route was built uphill and parallel to it.

But all is not lost. Videos exist of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal people travelling Visit www.youtube.com page false http://www.youtube.com/watch?v=OOP_QoizcWc#t=138.89297 false false%> the now abandoned section.

An especially good video shows how the tunnelled section %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal was built Visit www.youtube.com page false http://www.youtube.com/watch?v=1pYWj64bXk4 false false%>.

Related Content

  • More output for less fuel from Atlas Weyhausen’s new E Series compact wheeled loaders
    February 15, 2013
    Atlas Weyhausen’s new E Series wheeled loaders will be on display at Bauma with the AR 65e, AR 75e, AR 80e and AR95e Super all on view. Using newly developed Deutz engines, the new wheeled loaders offer up to 12% more output with lower fuel consumption figures. A key design feature of the engines is that they do not contain a particle filter and therefore are easier to maintain, claims the German manufacturer. There is a new steering valve on the E Series too, allowing operators to run the machine electroni
  • London’s congestion charge is saving lives, a study suggests
    March 9, 2015
    Traffic accidents in the UK capital London have declined 40% since the introduction of a congestion charge in 2003, according to a new study. The number of accidents per million miles driven in the congestion zone fell to 2.6 accidents per million miles from an average of 12.4 before the introduction of the charge. Researchers at Lancaster University also found a similar fall in the number of people seriously injured or killed. As well, accident rates fell in adjacent areas as a result of fewer motorists dr
  • Tata Steel invests for growth
    January 6, 2017
    Tata Steel is aiming to double its worldwide steel sales by 2017 in the lifting and excavating sector from its current volume of 500,000tonnes. To achieve this target the company has recently invested €40million to improve its product portfolio, by developing its quenched and tempered, and advanced downstream processing facilities in the UK. Tata Steel said it delivers a wider range of differentiated steel products to the lifting and excavating industry than any other steel producer in the world, and provid
  • Tata Steel invests for growth
    April 18, 2013
    Tata Steel is aiming to double its worldwide steel sales by 2017 in the lifting and excavating sector from its current volume of 500,000tonnes. To achieve this target the company has recently invested €40million to improve its product portfolio, by developing its quenched and tempered, and advanced downstream processing facilities in the UK. Tata Steel said it delivers a wider range of differentiated steel products to the lifting and excavating industry than any other steel producer in the world, and provid