Skip to main content

VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike

October 17, 2016
Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.

The Pennsylvania Turnpike Commission sold most of the disused section to the Southern Alleghenies Conservancy for $1 in 2001. The crumbling concrete strip is now managed by Friends of the Pike 2 Bike, a coalition of non-profit groups.

Many videos exist of people walking and bicycling down the road and the images, while at once very scenic, are also very melancholic.

It was called the Tunnel Highway because of its seven tunnels: Blue Mountain, Kittatinny Mountain, Tuscarora Mountain, Sideling Hill, Rays Hill, Allegheny Mountain and Laurel Hill. There was one tunnel through each mountain and the highway was reduced to a single lane in each direction through each tunnel. These tunnels were originally built as part of the South Pennsylvania Railroad. One short tunnel was bypassed during the original construction of the Turnpike.

By the late 1950s, the turnpike was heavily congested. To alleviate the situation, there was twinning of four tunnels - construction a second, parallel, two-lane tunnel – and also bypassing and closure of the other three.

The tunnelled section was abandoned in 1968 when a new bypass route was built uphill and parallel to it.

But all is not lost. Videos exist of %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal people travelling Visit www.youtube.com page false http://www.youtube.com/watch?v=OOP_QoizcWc#t=138.89297 false false%> the now abandoned section.

An especially good video shows how the tunnelled section %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal was built Visit www.youtube.com page false http://www.youtube.com/watch?v=1pYWj64bXk4 false false%>.

Related Content

  • Caterpillar loads up a golf course and takes it for a spin
    July 13, 2015
    Caterpillar’s recent advertising campaign lends new meaning to the term ‘driving range’. The construction equipment manufacturer loaded several heavy mining and dump trucks with soil and created a moving golf course, complete with greens and even a small waterfall. The company then had two golfers attempt to hit the “greens” as the trucks, including a 928 wheel load, drove around within driving distance of the professionals. Click here to see not just how well the golfers did underneath a clear blu
  • Losing your car ain’t as hard as you would think
    April 29, 2015
    Thankfully it doesn’t happen too often, but forgetting where you parked your car can be an embarrassing moment, or several days, as one man in the UK recently found. Jason Matthews, 40, ran the Manchester City Marathon on April 19 in five hours and 11 minutes and then spent an additional several hours looking for his Saab 93 Sport. He said he couldn’t recall where he had parked the vehicle. He walked back around some of the 26-mile – nearly 42km - course, before driving around in a taxi for 40 minutes an
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • World of Asphalt 2019
    December 12, 2018
    Tomorrow is your last chance to save 35% when you register for World of Asphalt 2019! Register now to attend the asphalt industry’s largest trade show and educational conference on February 12-14, 2019. Find solutions from 450 Exhibitors who will display their newest products and innovations. There’s no better place to train your team than World of Asphalt. With over 120 sessions to choose from, your whole team will leave with the right tools to grow.