Skip to main content

VIDEO: Kolin-Kalyon and Limak-Cengiz win North Marmara connector tenders

May 23, 2016
Turkey has awarded the much-delayed tenders for the motorway connector roads to Istanbul’s Third Bosphorus Bridge.

The 90km motorway section between Kinali and Odayeri was awarded to the Kolin-Kalyon joint-venture with completion in seven years and nine months, according to Turkish media reports. The 170km section between Kurtkoy and Akyazi was awarded to Limak-Cengiz joint-venture which will finish the work in six years and nine months.

The tenders were part of the 260km North Marmara Motorway project that includes the soon to be completed Yavus Sultan Selim Bridge. The Northern Marmara Motorway will, when completed, flow around the northern sections of Istanbul, the country’s financial centre.

The highway will cross the Bosphorus Strait over the Yavuz Sultan Selim Bridge and serve as the outermost beltway of Istanbul. The route runs from Kınalı on the European side to Akyazı on the Asian side. Importantly, the eastern end of the motorway will connect with the Otoyol 4, also known as Anadolu Otoyolu or Anatolia Motorway. The O-4 is a toll motorway connecting the northeastern Marmara Region to the Central Anatolia Region, including the capital Ankara.

The four-lane Third Bosphorus Bridge, now officially the Yavuz Sultan Selim Bridge, is a 2.2km cable-stayed and suspension crossing for rail and motor vehicles. The longest span is just over 1.4km and width is 58.4m. The bridge sits between Garipçe in Sarıyer on the European side and Poyrazköy in Beykoz on the Asian side. Work started in May 2013 and completion is expected later this year.

Related Content

  • Eurasia Tunnel wins prestigious IRF award
    March 8, 2018
    New road connection linking Europe to Asia scoops IRF Global Road Achievement Award The Eurasia Tunnel was built to connect the Asian and European sides of Istanbul for the first time via a 3.4km twin-deck road tunnel going underneath the seabed. The 14.6km Eurasia Tunnel route was identified based on extensive feasibility studies conducted in 2005 for the Ministry of Transport, Maritime Affairs and Communications of Turkey. Its main aim was to relieve Istanbul’s transcontinental traffic pressure, reduce
  • Czech tenders for D6 section near Karlovy Vary
    June 7, 2023
    The Petrohrad-Lubenec section includes several bridges with work starting by the end of the year for completion in 2026.
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.
  • UK: Work starts on Mersey Gateway main bridge deck
    June 2, 2016
    Work has started on 2.2km Mersey Gateway’s main bridge deck as the project enters its third year of construction. The new six-lane toll bridge will link the English towns of Runcorn and Widnes and teams will begin to connect the steel support cables to the deck and upper pylons this summer. Trinity, the project’s movable scaffolding system (MSS), has cast the first 250m of the north approach viaduct and a new MSS is on its way to Halton to build the south approach viaduct. The local road network is al