Skip to main content

VIDEO: Explosive bridge demolition in Southern Italy

February 15, 2016
Italian contractor General Smontaggi has carried out a successful bridge demolition project in the south of the country. Explosives were used to remove the redundant Viadotto Caffaro Bridge carrying the A3 Autostrade. The 390m long structure had been found to be unsuitable for modern traffic requirements on the route, located in Calabria. The demolition project was not straightforward as the new bridge had already been constructed alongside the redundant structure. The extensive pre-weakening work for the old bridge included cutting into the deck to ensure it collapsed downwards. The charges were timed in such a way as to break up the bridge deck first and allow those pieces to fall, before a second round of charges detonated to bring down the supports. The explosives for the supports were also placed very carefully to ensure that in falling, they would not strike any part of the new bridge.

Related Content

  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • VIDEO: Bridge demolition on key A90 route in Scotland
    November 4, 2015
    Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th.
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep