Skip to main content

VIDEO – Explosive blast apart redundant US bridge

July 13, 2015
The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank. The bridge was then closed to vehicle traffic in 2009 because the structural deficiencies had been identified by the local authorities. Despite being designated a historic bridge by the Washington County History & Landmarks Foundation, the Donora-Webster Bridge was earmarked for demolition. The contractor used close to 32.7kg of explosives placed at 387 separate points around the structure so as to break up its structural integrity, resulting in it crashing into the river below in a successfully controlled demolition.

Related Content

  • Rebuild project for historic Pennsylvania bridge
    September 10, 2015
    Rebuilding work is planned for a historic bridge in the US state of Pennsylvania to ensure it remains able to carry current traffic volumes. The work is being managed by consulting engineer Michael Baker International. Pennsylvania Department of Transportation (PennDOT) selected Michael Baker International for the US$5 million engineering and design project that will focus on the western spans of the Market Street Bridge in Harrisburg. Rehabilitating this critical traffic artery in Pennsylvania's capital re
  • No video provider was found to handle the given URL. See the documentation for more information.
    No video provider was found to handle the given URL. See the documentation for more information.
    VIDEO - Controlled bridge demolition over motorway
    September 15, 2016

    A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.

  • Stone Arch Bridge Rehabilitation
    May 19, 2022

     

    Rehabilitating an Historic Landmark

  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.